The commercial operating system for construction. Capture a commercial event once, every downstream workflow stays connected.
See the whole product →
Contract models
Fixed, cost plus & open book
Claim a fixed sum, reimburse at actual cost, or bill fully open book. ClaimStack handles each, the right way.
See how →
Solutions
Overview
Built for every side of the contract. One commercial record the whole project team can trust, head contract to supplier.
See how it fits your role →
For subcontractors
Free to collaborate
Invited to a project? Submit claims and variations in a format that holds up, free forever.
See the plan →
Resources
Overview
Practical guides on claims, variations and contracts, plus how ClaimStack connects, who's behind it, and how we keep your commercial data safe.
Read the blog →
Get started
See it on your project
A 30-minute walkthrough on your numbers, where the margin usually leaks.
Book a demo →
Pricing
Product/Subcontracts

One contract. One live position.

One unified contract model for subcontracts and consultant agreements, claims and variations assessed against the live contract position, cent-perfect and SOP-compliant.

Set the contract once. Assess everything against the live position.

01 · Set the contract

Enter the contract once.

One unified from/to party model for subcontracts and consultant agreements. Set the contract sum and line items a single time, the base for every claim, variation and payment that follows. Choose progress-claim or direct-invoice billing.

SC-NB-APX-01 · Cost breakdown
Contract breakdown
Entered once
Contract itemAmount% of sum
Site establishment & set-out$168,0004.0%
Formwork to columns & walls$742,00017.8%
Reinforcement supply & fix$968,00023.2%
Concrete supply & place$1,540,00036.8%
Suspended slabs & topping$512,00012.2%
Stairs, landings & sundries$250,0006.0%
Original contract sum$4,180,000100%
The base for every claim, variation and paymentSet once, locked
02 · Run it

Assess against the live position.

Claims and variations are assessed against the live contract position, cent-perfect, with a full audit trail. Issue SOP-compliant payment schedules, with retention and GST calculated for you rather than hand-typed.

Claim SC-APX-05 · Assessed
Apex Concrete Structures
Cent-perfect
Applied forCertified
Contract works this claim$452,000$446,400
Variation works this claim$46,000$44,800
Certified this claim$498,000$491,200
Less retention (5%)-−$24,560
Payable this claim (ex GST)$466,640
03 · Always current

The position stays alive.

The contract position updates as every claim, variation and payment lands, and flows straight into the forecast and cost report. No rebuilding the number at month-end, no drift between what was claimed and what was committed.

SC-NB-APX-01 · Concrete structure
Apex Concrete Structures
Active
Original contract sum$4,180,000
Approved variations+$142,600
Adjusted contract sum$4,322,600
Certified to date$2,185,400
Retention held (5%)−$109,270
Remaining to claim$2,137,200
Claimed 50.6%Live, reconciled from the record

One model, every agreement.

STEP 01
One model

Subcontracts and consultants run on the same unified contract, the label differs, the mechanics don’t.

STEP 02
Enter once

Contract sum and line items set a single time, the base for everything downstream.

STEP 03
Assess live

Every claim and variation is measured against the current contract position.

STEP 04
Flow through

Each movement updates the forecast and cost report automatically.

1
Unified contract model
Cent-perfect
Every assessment
100%
SOP audit trail
0
Month-end rebuilds

Frequently asked

Are subcontracts and consultant agreements handled differently?

No. Both run on the same unified from/to contract model, the label differs, the mechanics are identical. Contract sum and line items are entered once, and every claim, variation and payment is assessed against the same live position.

What’s the difference between direct-invoice and progress claims?

It’s a billing choice you make on the contract. Progress claims are assessed line by line against the contract position with a payment schedule issued back; direct-invoice contracts are billed straight against the contract. Either way the position stays live and flows into the forecast and cost report.

Can a submitted claim or variation be changed later?

Submitted financial records are permanent and read-only. Corrections are made as new revision records that reference the original, so the full audit trail is preserved, which is exactly what you need if a claim is ever adjudicated.

Run every subcontract
on one live position.